08 / Specialty / Structural

Zip Level Measurements

Zip Level elevation measurements document foundation relative elevations to within a hundredth of an inch, providing the objective data needed to quantify slab movement and support repair or insurance decisions.

01

What a Zip Level reading provides

A grid of precise elevation readings across the slab, plotted into a floor plan that visualizes high and low points. Unlike a marble-on-the-floor check, these are repeatable, documented measurements an engineer, insurer, or foundation company can act on.

02

When to order one

Any time you suspect foundation movement, before committing to repairs, or as a baseline to monitor a home over time. Pairs well with an engineering foundation evaluation.

Ready when you are.

Most option periods run five to ten days. Get on Curtis’s calendar today, walk the property tomorrow, and have a photo-rich digital report delivered within 24 hours of the inspection.

Same-day appointments available · InterNACHI CMI Certified · Rockwall · Greater DFW